A couple of close ups of the quilting. Yes, I did a lot of quilting! It has been washed and dried to a nice crinkle. It has already been cat tested and approved.
My next 2nd Quarter finish is my Hop Skip and Jump BOM quilt. The fabrics I went with are Bonnie and Camille Happy Go Lucky. I had to get this one done as the Spinning in the Rain BOM with Sew Lux Fabric has started.
This picture just does not do this quilt justice! All washed and dried as well as cat approved. In the interest of time, both quilts had the binding machine stitched on.
The third quilt is number two of two baby girl quilts. Mom of the baby girl is a US Marine and Dad loves to sail. So what better fabrics than these?
Here is a close up of the lighthouse and captain's wheel quilting.
And finally, a picture of the back of the quilt. This back is pieced because I used every last bit of fabric to make it!
Linking up now with Amanda Jean at Crazy Mom Quilts Finish it Up Friday.